Article ID: 122575, created on Aug 5, 2014, last review on Sep 14, 2015

  • Applies to:
  • Operations Automation 5.5

Releases Notes

Fixed Issues

POA-87205 Task Propagation of APS 2.0 resources for the account completes successfully without any actions in case of big number of DNS records

POA-87197 Cannot remove account after APS 2.0 subscription was removed: API call hangs on APS DELETE REST call

POA-86990 Always one value is passed to setting 'domain' from the list of domains

POA-86989 Async provisioning for requests not initiated via APSC REST API

POA-86987 During POST and PUT operations error is thrown in some cases: "The underlying connection was closed: The connection was closed unexpectedly."

POA-86245 APS2 usage reporting for Lync: XML report contains numbers two times bigger than actual

POA-86109 [LyncAps2.0 + SPF2010] unable to create SPF site: Domain service (ds_id = 52) not found

POA-85951 APS CEP report fails because of various broken packages

POA-85941 Don't set transfer-encoding:chunked for responses with empty body

POA-85940 SAAS controller may crash during parsing of URL mapping


Hotfix can be downloaded here.


See UPDATE.txt in the hotfix archive for installation instructions.


  1. Task "Propagation of APS 2.0 resources" is redesigned in such a way that it processes DNS records in bunches by 10000 items. After that the task is rescheduled and next 10000 DNS records are processed and so on. It means that task would require several reruns to process all DNS records on provider's domain if the latter contains many DNS records.
  2. To relaunch the task "Propagation of APS 2.0 resources", please run saas_ctl in the following way:

    saas_ctl sync_account 1 no

5b048d9bddf8048a00aba7e0bdadef37 caea8340e2d186a540518d08602aa065 5356b422f65bdad1c3e9edca5d74a1ae 2554725ed606193dd9bbce21365bed4e e12cea1d47a3125d335d68e6d4e15e07

Email subscription for changes to this article
Save as PDF