Article ID: 120086, created on Feb 12, 2014, last review on May 9, 2014

  • Applies to:
  • Odin Business Automation Standard 4.5

Symptoms

I have a Virtuozzo Container hosting plan with application "Parallels Power Panel" enabled:

Top > Billing Director > Product Manager > Hosting Plans > %hosting_plan% > Applications

But "Parallels Power Panel" is disabled in the container after provisioning. Option "Enable PPP" is shown on the container preferences page:

Top > Service Director > Virtuozzo Manager > Containers > %container%

Cause

There are two event types associated with the container object with Power Panel management actions:

Top > Configuration Director > Event Manager > Events

  • Container has been stopped
  • Container has been started

Action "Disable Power Panel" is enabled on container stop, but action "Enable Power Panel" is disabled on container start:

Top > Configuration Director > Event Manager > Events > Container has been stopped > Actions

Disable Power Panel ON

Top > Configuration Director > Event Manager > Events > Container has been started > Actions

Enable Power Panel OFF

Resolution

Synchronize status of the actions: either disable or enable or remove both actions "Disable Power Panel" and "Enable Power Panel" in the events types.

Search Words

Container has been started

Disable Power Panel

Power Panel is disabled

Container has been stopped

Enable PPP

Power Panel in container

invalid status of Power Panel

Enable Power Panel

400e18f6ede9f8be5575a475d2d6b0a6 caea8340e2d186a540518d08602aa065 624ca542e40215e6f1d39170d8e7ec75 70a5401e8b9354cd1d64d0346f2c4a3e

Email subscription for changes to this article
Save as PDF